Ayb School’s new building - Be part! | Ayb Educational Foundation
Ayb School’s new building
76%RAISED

Ayb School’s new building


Ayb School is expanding to include a new building. The construction of Ayb Middle School (Building C) is underway. The total area of the building is 4,200 square meters. It is a four-story building designed for 180 students from 5th to 9th grades. Elementary and high school students will also take advantage of the building. Building C is being constructed in front of Buildings A and B of Ayb School. The architectural concept of the new building has taken into account the general layout of the Ayb campus along with the architecture of other buildings in the hub. The building, which is both beautiful and practical, comes with energy-saving solutions. All the materials used for the interior and exterior decor of the building are environmentally friendly and easy to clean. In addition to classrooms and offices, psychologist’s and medical rooms, cafeteria and gym, the new building will also have dance and music studios, a science lab, a media lab, a LEGO lab, an IT lab, a workshop lab,  an art studio, an amphitheater as well as leisure and game zones.

The opening of the new Ayb School building is scheduled for fall 2016.


Please click here for detailed information. The detailed description of the Ayb School project is available here.

59 donors from 4 countries

have already joined the Ayb Middle School project

  • Ayb School’s new building
  • Ayb School’s new building

$2,520,600 have been raised

We need another $1,979,400 to complete the project